翻訳と辞書
Words near each other
・ Agarose
・ Agarose 3-glycanohydrolase
・ Agarose gel electrophoresis
・ Agarovići
・ Agarpara
・ Agarru
・ Agartala
・ Agartala (Vidhan Sabha constituency)
・ Agartala Airport
・ Agartala Baptist Church
・ Agartala City Baptist Church
・ Agartala Conspiracy Case
・ Agartala Government Medical College
・ Agartala Jagannath Mandir
・ Agartala Municipal Corporation
Agartala railway station
・ Agartha
・ Agarwal Mandi
・ Agarwood
・ AGAS
・ Agasa Thimmanahalli
・ Agasabal
・ Agasabal, Basavana Bagevadi
・ Agasabal, Muddebihal
・ Agasadi
・ Agasage
・ Agasal
・ Agasalim Atakishiyev
・ Agasalkatta
・ Agasanahalli


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Agartala railway station : ウィキペディア英語版
Agartala railway station

Agartala Railway Station (Bengali: আগরতলা রেল স্টেশন) is located 5.5 km (2.96 nautical miles) from Agartala in Tripura, India.〔Agartala〕 The 413 km route connects to Lumding with a meter gauge track, where finally it bifurcates into a broad gauge track. Agartala is the second capital city (after Guwahati, Assam) in the Northeast India to be connected to the country's railway network, there are lot of modes of transportation are available to reach the city from the station. The lines connect from Lumding with a meter gauge track to Agartala and is almost in its way for a connection towards the extreme end point of the state to sabroom. There are total 14 stations in Tripura with Churaibari being the last one.〔railway stations of agartala〕 Total length of track in this state is 153 km (appx) following of which the territory of Assam starts. Agartala is the first state capital in independent India to be connected with rail network〔http://www.skyscrapercity.com/showthread.php?t=1303787〕
== History ==
Trains first reached Tripura in 1964 when the railway was extended to the state's northern business hub, Dharmanagar. Later it was extended further to Kumarghat. The northeastern state capital came on India's railmap with the advent of the railways in the subcontinent in 1853. The foundation stone of the 119 km Kumarghat-Agartala railway project was laid in 1996 by the former Prime Minister H. D. Deve Gowda and during the laying of rail lines, provisions were kept for swiftly converting it to broad gauge. 40 years time was taken by the Government since then to connect Agartala by rail.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Agartala railway station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.